Home / Cases / Project Cases
Holtop's HVAC project construction team delivered a complete printing-factory installation in Fiji, managing the project from pre-installation through to completion. The scope showcases Holtop's turnkey capability — not only manufacturing the equipment but also executing on-site construction and commissioning.
The system centered on an air-cooled water chiller paired with modular air handling units, complete with compressor, water tank and full ductwork. Holtop's construction team handled pre-installation preparation, on-site assembly and final commissioning, delivering a fully operational HVAC system for the printing facility.
From factory manufacturing to on-site construction, Holtop provides customers with genuine turnkey HVAC project solutions. This full-service model reduces coordination risk for overseas industrial clients and ensures the installed system performs exactly as designed.

Copyright © 2025 by Beijing Holtop Air Conditioning Co., Ltd - Privacy Policy