Get a Free Quote

Our representative will contact you soon.
Email
WhatsApp/Mobile
Name
Company Name
Message
0/1000

News

News

Home /  News

Custom Heat Recovery AHU for Power Plant in Mongolia | -35°C HVAC

Mar 27, 2026

Project Details

  • Location: Mongolia

  • Industry: Power Generation

  • Provided Equipment: Custom Heat Recovery Air Handling Unit (with DX cooling & electric heating)

Client Requirements

  • Multi-Tasking Unit: A single system to ventilate, cool, heat, and filter the air.

  • Severe Cold Tolerance: Must operate efficiently in extreme Mongolian winters dropping to -35°C.

  • Compact Size: The facility had highly restricted space for HVAC installation.

  • Proven Reliability: Preferred a brand with established local market awareness.

The Delivered Solution

  • Optimized Efficiency: We designed the system using our proprietary software to match exact needs, ensuring zero power waste.

  • Space-Saving Integration: Combined a heat recovery wheel (ventilation), an inverter DX condensing unit (cooling), and an electric heater (heating) into one tight footprint.

  • Strategic Heating: Leveraged the power station's abundant electricity to run the electric heater, providing a perfect and reliable heating source for the -35°C environment.

  • Trusted Track Record: Delivered peace of mind by drawing on our successful history with Mongolian industrial and commercial clients since 2002.

Mongolia-Customized Heat Recovery Air Conditioning Units for Power Station.jpeg