Home / Cases / Project Cases
Protecting Doctors, Nurses and Patients Since the 2020 COVID-19 outbreak, Holtop has designed, manufactured and installed fresh-air purification equipment for Xiaotangshan Hospital and seven other emergency hospital projects, providing supply, instal...
Jul. 24. 2026
A Growing Track Record in Bangladesh Since 2018 Holtop has delivered HVAC solutions across a wide range of Bangladeshi industries, establishing itself as a trusted air handling unit, water chiller and heat recovery ventilator supplier for the region'...
Jul. 24. 2026
Project Overview Holtop's HVAC project construction team delivered a complete printing-factory installation in Fiji, managing the project from pre-installation through to completion. The scope showcases Holtop's turnkey capability — not only ma...
Jul. 24. 2026
Standing With Frontline Hospitals At the onset of the 2019-nCoV coronavirus outbreak, Holtop — one of the top heat recovery ventilation system manufacturers — mobilized to support emergency hospitals. Drawing on its experience supplying B...
Jul. 23. 2026
Project Overview Holtop supplied an energy-saving environmental air-conditioning and ventilation solution for a garment factory in Bangladesh. Textile and garment production floors require large volumes of clean, temperature-controlled fresh air to p...
Jul. 23. 2026
Project Overview A paper manufacturer in Ulaanbaatar, Mongolia, faced excessive heat generated by its production machinery and needed to reduce indoor temperatures across a densely packed plant floor. With production equipment occupying most of the i...
Jul. 22. 2026
Project Overview The Taoyuan Museum of Art, an emerging cultural institution occupying 29,000 m² in Taoyuan City, Taiwan, selected Holtop as its ventilation partner. As a leading air-to-air heat recovery unit manufacturer, Holtop supplied 25 set...
Jul. 22. 2026
Project Overview For a newly built restaurant in Armenia, Holtop's BAQ team supplied a high-efficiency fresh-air heat recovery AHU with an integrated DX system. The unit continuously delivers preconditioned fresh air — preheating or cooling it ...
Jul. 21. 2026
Project Overview For a 2,750 m² biscuit production line in Tanzania running three ovens 24 hours a day, Holtop delivered a purpose-built food-factory ventilation system. With oven discharge temperatures around 40°C, the plant needed reliable...
Jul. 21. 2026
Project Overview Holtop delivered a complete industrial HVAC solution for a state-of-the-art printing security-products manufacturing base in Malta. Spanning roughly 29,000 m² across three construction phases, the project required precise temper...
Jul. 20. 2026
Location: FinlandApplication: Automotive Painting Workshop (800㎡)Core Equipment: HJK-270E1Y(25U) Plate Heat Recovery Air Handling Unit | Airflow: 27,000 CMH HJK-021E1Y(25U) Glycol Circulation Heat Recovery Air Handling Unit | Airflow: 2,100 CMH ...
Aug. 22. 2025
Discover Holtop’s commercial fresh air system project cases across China, including schools, hospitals, offices, data centers, and sports venues. Learn how Holtop’s energy-efficient HVAC solutions improve indoor air quality and support smart building development.
Jul. 28. 2025
Copyright © 2025 by Beijing Holtop Air Conditioning Co., Ltd - Privacy Policy